- With total 12 years experienced in Oil and Gas 

- With experienced in Project Engineering and Coordination for Project Management,Topside, SUBSEA, Commissioning Campaign, FAT, Offshore and Onshore Support 

- Experience in Topside (Onshore Support) – 12 Years (Engineering and coordinator) 

Integrated and coordinate element of all activities from planning and workpreparation for the project. 

- Prepare the milestone zero, coordinate manning crew, crew rotation, tools andequipment for offshore activities 

- Prepare Roadmap, (Pre-Shutdown, Shutdown & Non-Shutdown Scope),(Timeline, Scope Optimization & CAR), Guestimate manhour, IPOP, Hazid, TQand etc. 

- Review IFC, AFC, Leak Test Procedure, lifting Plan, 3D laser survey drawings,JC, material handling and etcExperience in SUBSEA (Onshore Support) – 3 years  

- Prepare the Commissioning Subsea Equipment Procedure (SAPL Pig Launched,SAPL Retrieve & Installation, Pig Reload) 

- Experience in TOPSIDE & SUBSEA (Offshore Support) – 3 years 

- Start-Up, Pre-Commissioning, Commissioning & Trouble Shoot Experience in Hands-on Exposure – 5 years 

- Fully tasted and Factory Acceptance Test (FAT) for wide range of ChemicalInjection Skid. 

- Trouble Shoot variable type of Chemical Injection Unit 

- Lead the training and workshop for client 

- Experience in Project Engineering / Management – 7 years 

- Prepared and Produced the P&ID, GA Drawings, Details Drawing andFabrication Drawing. 

- Interpreted Technical Drawings, P&ID, Codes and Standards as well as ClientSpecification/Requirements. 

- Prepared Bid Evaluation / Tenders, Detail Design (Project Execution) forChemical Injection Package (CIU), TUTU & HPU 

- Involved in EPC & EPCC (predesigned, design, package costing, and packageproposal) 

- Knowledge in (API674, API675) Rotating Equipment for Chemical Injection Skid andTested the pump based on API675 spec 

- Knowledge in (API610, API685) Rotating Equipment for Transferring Chemical Skid. 

- Knowledge in Air/Gas Operated Rotating Equipment for Transferred and injected thechemical. 

- Performed calculation, details design and fabricated for HVAC systems, all type ofdamper (fire dampers, louvers, adjustable louvers, pneumatic dampers), andductwork system for air conditioning systems based on project requirements and projectsdocuments.

More Information

  • Experienced In Oil and Gas / Energy / Power / Infrastructure

Education

February 2004 -November 2007
Bachelor in Mechanical Engineering
University Industrial Selangor (UNiSEL)

Degree in Mechanical Engineering (HONS)

Work Experience

August 2017 -Currently working
Lead Project Coordinator / Engineer
Adinin Works Engineering Sdn Bhd

·        Onshore & Offshore Support for BrownfieldDepartment. ·        Onshore Support (Topside)§  Prepare Roadmap for Project §  Prepare Pre-Shutdown, Shutdown & Non Shutdown Scope, §  Prepare Scope Optimization, Time line & CAR for SD and NSD Scope,§   §  Prepare IPOP, Hazid, TQ and etc. §  Review IFC, AFC, Leak Test Procedure, lifting Plan, 3D laser surveydrawings, JC and material handling ·        ·        ·        ·        ·        ·        ·        ·        Manage and coordinate with business partners on theActuated Ball Valves stroke test ensure all valves are tested prior to load outoffshore. 

December 2014 -June 2017
Project Engineer
Aker Solutions Sdn Bhd

JobInvolvement  ·        Onshore Support (Subsea /Topside)§ Lead the Workshopwith Vendor / End-User/ Sub Contractor / etc·        Offshore Support § Lead Engineer forPre-Commissioning / Commissioning for CIU § Lead / Assistmaintenances team and trouble shoot for CIU  ·        and fully tasted for a wide range of ChemicalInjection Skid, TUTU & ETC. ·         project tender proposal (Budgetaryproposal, Technical proposal and Commercial proposal)·        LeadEngineer for Flushing unit NAS Class 6 (Air –Driven) come withone filter cartridge for suction and one filter cartridge for discharge. LeadEngineer for Hydraulic Power Model forcompletedKAKG-A system

February 2012 -November 2014
Senior Project Engineer
Nexus Deepwater Sdn Bhd

Job Involvement  Prepared inquiry, package costing and package proposal (Budgetary Proposal, Technical Proposal and Commercial Proposal) for completed Chemical Injection System (CIU) for Oil and Gas Industry, Power Plant Industry and general industries.  ·        ·         Leadthe fabrication work at ProMinent Yard for Chemical Injection System. Testing the completed Chemical Injection Skid (FAT) at ProMinent yard or at client yard. Testing API675 – Orlita with API 675 spec (5 point or linearity testing – base on client specification) Commissioning completed Chemical Injection Skid at Offshore or Onshore.

August 2010 -January 2012
Sales & Project Engineer
ProMinent Fluid Controls (MO) Sdn Bhd

Predesigned for early stage, Biding Stage and Assemble (Project) stage for P&ID for Chemical Injection System (CIU) Package using AutoCAD 2010 software. Prepared package costing and package proposal (Budgetary Proposal, Technical Proposal and Commercial Proposal) for API 675 pump and portable chemical injection skid project for Oil and Gas Industry, Power Plant Industry and general industries.  ·        Cover forSales and Services for Oil and Gas,Petrochemical, EPCC Company and End-user for (Mechanical Division for API675 –Milton Roy Pump (Motor Driven), Williams pump (Air Driven), Milton Roy Mixer(Air or Motor operated) Testing the completed Chemical Injection Skid (FAT) at client yard. Testing API675 – Milton Roy pump and Williams pump with API 675 spec (5 point or linearity testing – base on client specification) Commissioning completedChemical Injection Skid at Offshore or Onshore.